Copyright © Zhongshan Pengyun Electronics Technology Co., Ltd. All Rights Reserved. Site Map
The most common problems in wind power projects are fatigue fracture, corrosion failure, loss of preload, poor adaptability of composite materials, and dynamic load failure. The Zhuhai wind power project uses our Dacromet-coated 12.9-grade bolts + smart gaskets. The life of our bolts is extended to 10 years in a salt spray environment, the annual maintenance cost of a single wind turbine is reduced by RMB 200,000.